Mainland continuity templates assume fallbacks that an island often cannot provide. This article explains where Guernsey and Jersey plans go wrong and what to do differently.

What Island Concentration Risk Is

Many business continuity plans used in the islands were written somewhere else, or are simple generic templates. They assume that when the office is lost you move people to another site or home, when a supplier fails you call the next one on the list, and when the network goes down your provider fails over to a different route. On the mainland those assumptions usually hold. The islands are joined to the rest of the world by a small number of cables, single airports and a few harbours, so here they often do not.

That is island concentration risk. It is the risk that many of the things your plan treats as independent fallbacks actually depend on the same few pieces of infrastructure, the same few suppliers and the same few people. When one of those fails, your primary arrangement and your backup can fail together.

The Single Points That Sit Underneath Everything

Three dependencies sit underneath almost every Channel Islands business, whatever the sector.

Power. Most of our electricity is imported from France over the subsea cables of the Channel Islands Electricity Grid. Jersey imports around 95% of its electricity through three cables to France. Guernsey imports through a single interconnector to Jersey, so everything it imports passes through Jersey first. Both islands have seen what happens when a link fails. In June 2012 Jersey's first cable to France failed permanently, leaving the island reliant on a single cable and running diesel generators until a new cable was switched on in 2014. On 1 October 2018 the Guernsey to Jersey link failed and Guernsey lost power during the evening rush hour. Supply came back within the hour from on island generation, but the cable never fully returned to service and Guernsey generated around two thirds of its own electricity for months until the undersea section was replaced. Guernsey Electricity has said repeatedly that a second, direct connection to France is needed for long term security of supply. In both islands, on island generation is the fallback. It works, but it is not designed to be the everyday source.

Connectivity. Voice and data traffic leaves the islands over a handful of subsea fibre cables, run by a small number of operators. On 28 November 2016, one ship's anchor dragged across the seabed and severed three of JT's four international cables in a single evening, and cut voice cables used by Sure in the same incident. Traffic was rerouted via France and services kept running, but with less capacity. The islands' operators have invested heavily in diverse routes, and that investment has worked. The point for a firm's plan is not that the cables are weak. It is that your primary line and your "diverse" backup line may be bought from different companies and still reach the mainland through the same small set of physical routes.

Jersey coastline and waterfront buildings
Jersey, Channel Islands. Photo: Luke Moss, Unsplash

People and goods moving on and off the islands. Freight, post, spare parts and visiting engineers arrive by a limited set of sea and air links. Severe weather routinely cancels sailings and flights, sometimes for several days. In 2023 the States of Guernsey lent the ferry operator £26 million to secure a conventional ferry, specifically to protect the lifeline freight service. Since March 2025 the two islands have had separate ferry operators, Brittany Ferries for Guernsey and DFDS for Jersey, so one island can no longer assume it will share the other's sea links in a disruption. Any plan that relies on "the supplier will send an engineer" or "we will ship replacement hardware" has a weather clause built in, whether it says so or not.

Where Conventional Plans Go Wrong

When we review continuity arrangements for island firms, the same weaknesses come up again and again.

Home working and the second office share the outage. Sending staff home or to a second office looks like a strong alternative, but it is not. When power or connectivity fails across the whole island, every one of those locations is affected at the same moment.

Supplier diversity is on paper only. Two local IT providers, two telecoms contracts and two couriers can still depend on the same cable route, the same data centre or the same freight sailing. Diversity has to be checked at the level of the physical dependency, not the contract.

The key people are the same people. Small teams on a small island often share one specialist, one IT contractor or one outsourced administrator with several other firms. If that person or company is overwhelmed by a wider incident, every client is queuing for the same help.

Recovery times assume mainland logistics. A four hour recovery time objective for a failed server only holds if the replacement part, or the engineer, can reach the island within four hours. During a run of storms, that may not be possible.

Services hosted elsewhere are assumed to keep working. Cloud platforms and group IT services are hosted elsewhere and will usually keep running, but what are their own failover plans? Your access to them is the part that sits on the island, and that is exactly the part a whole island outage takes away.

What a Plan Built for the Islands Does Differently

The answer is not a thicker plan. It is a plan built around the specific way an island fails.

  1. Map dependencies to the infrastructure level. For each important business service, trace the dependency past the supplier name to the cable, the site and the transport link it relies on. Common points of failure become visible quickly.

  2. Have at least one recovery option off the island. For critical services, a recovery option off the island, whether a group office in the UK, a contracted provider or staff who can work from the other island or the mainland, protects against the events that take out every local option at once.

  3. Hold what you cannot quickly get. Spare hardware, fuel for generators and key consumables are worth keeping on the island when replacements depend on sailings.

  4. Test whole island scenarios, not just building scenarios. Exercises that remove power, connectivity or transport for the whole island at once are what expose shared dependencies. A fire in your own building does not.

  5. Ask your outsourcers the same questions. Under the GFSC's outsourcing and cyber security expectations and the JFSC's outsourcing policy, the board remains responsible for services it has outsourced. Ask key providers where their own recovery sits and what they would do if the whole island lost power or connectivity, and keep the answers as evidence.

A Question for the Board

The GFSC and the JFSC both expect boards of regulated firms to own their risk management and to be able to show that it works. Concentration risk is a good test of whether that is happening. A plan that recovers from a broken server but not from a broken island is a plan for the wrong risk.

If you would like an independent view of how exposed your own arrangements are, Armstrong Resilience runs island concentration reviews and whole island scenario exercises for regulated firms and government across the Channel Islands. Find out more about our business continuity consultancy or call our office on +44 (0) 1481 251683.

Frequently Asked Questions

What is island concentration risk?

The risk that arrangements a continuity plan treats as independent fallbacks depend on the same few pieces of island infrastructure, suppliers or people, so they fail together.

Does a second office in St Peter Port or St Helier count as a recovery site?

Only for events that affect one building. For a whole island loss of power or connectivity it shares the same outage, so critical services also need an option off the island.

Photo at top: Clarence Battery, St Peter Port, Guernsey. Enrapture Captivating Media, Unsplash.

 
 
 

Recent Posts

See All
Horizon Monitor: Regulatory Resilience | Week 48

UK regulators say their new cyber guidance adds no new rules. That means they can hold you to it today. In Europe the ECB has checked the cyber, third party and ICT controls of some of their largest b

 
 
 

Comments


bottom of page